| 
                                    Title:
                                 | 
				
                                    Magnolia Creek fka Riverview Flower Farm Phase 2 Replat PI#5855
Accept the plat for recording for Magnolia Creek fka Riverview Flower Farm Phase 2 Replat,
located in Section 31, Township 30, and Range 20. Construction has been completed and has
been certified by Strickland Smith, a Florida Professional Engineer, with Heidt Design.
School Concurrency does not apply to this project.
                                 |