File #: 2025-0026   
Type: Consent Agenda Status: Passed
In control: BOCC Land Use
On agenda: 3/11/2025 Final action: 3/11/2025
Title: Magnolia Creek fka Riverview Flower Farm Phase 2 Replat PI#5855 Accept the plat for recording for Magnolia Creek fka Riverview Flower Farm Phase 2 Replat, located in Section 31, Township 30, and Range 20. Construction has been completed and has been certified by Strickland Smith, a Florida Professional Engineer, with Heidt Design. School Concurrency does not apply to this project.
Attachments: 1. Magnolia Creek

title

Magnolia Creek fka Riverview Flower Farm Phase 2 Replat PI#5855

Accept the plat for recording for Magnolia Creek fka Riverview Flower Farm Phase 2 Replat,

located in Section 31, Township 30, and Range 20. Construction has been completed and has

been certified by Strickland Smith, a Florida Professional Engineer, with Heidt Design.

School Concurrency does not apply to this project.