RZ-PD 18-0996
| A.1. | Withdrawls, Continuances and Remands | RZ-PD 18-0996 STREETFRONT COMMERCIAL PROPERTIES LLC
This application has been withdrawn by the applicant | Continued | Pass |
Action details
|
Not available
|
PRS 21-1153
| A.2. | Withdrawls, Continuances and Remands | PRS 21-1153 WOODIES WASH SHAK
This application has been withdrawn by the applicant | Continued | Pass |
Action details
|
Not available
|
RZ-PD 22-0441
| A.3. | Withdrawls, Continuances and Remands | RZ-PD 22-0441 AMH Development, LLC.
This application has been withdrawn by the applicant | Withdrawn | Pass |
Action details
|
Not available
|
PRS 22-0523
| A.4. | Public Hearing-Land Use | Application Number: PRS 22-0523
Applicant: MARONDA HOMES
Location: 1650 ft W of Deshong Dr & S Side of W Knights Griffin Rd.
Folio Number: 80605.0000, 80610.0000, 80620.5004 & 81001.1000
Acreage: 84.55 acres, more or less
Comprehensive Plan: RES-1
Service Area: Rural
Community Plan: East Rural
Existing Zoning: PD (04-1157)
Request: Minor Modification to PD
· Modify lot size and lot width requirements and
modify internal vehicular circulation and access.
RECOMMENDATION: Approvable, subject to proposed conditions | Continued | Pass |
Action details
|
Not available
|
PRS 22-0657
| A.5. | Withdrawls, Continuances and Remands | PRS 22-0657 DAVID WRIGHT/ TSP COMPANIES, INC
The application has been withdrawn by the applicant | Continued | Pass |
Action details
|
Not available
|
RZ-STD 22-0697
| A.6. | Public Hearings - Related Items | Application Number:
RZ-STD 22-0697
Applicant:
AMQ INTERNATIONAL CORP
Location:
NW Corner of Lakewood Dr & E Broadway Ave.
Folio Number:
65719.0000 & 65720.0000
Acreage:
3.82 acres, more or less
Comprehensive Plan:
RES-9
Service Area:
Urban
Community Plan:
Seffner Mango
Existing Zoning:
PD (86-0193) & ASC-1
Request:
Rezone to CG
RECOMMENDATION:
Zoning Hearing Master:
Approval
Development Services:
Approval
Planning Commission:
Consistent with Plan | Continued | Pass |
Action details
|
Not available
|
PRS 22-0730
| A.7. | Public Hearing-Land Use | Application Number: PRS 22-0730
Applicant: MARK BENTLEY, ESQ, B.C.S, AICP
Location: NE Corner of Gunn Hwy & N Hubert Ave.
Folio Number: 23564.0100, 23585.0000, 23595.0000 & 23664.0000
Acreage: 1.12 acres, more or less
Comprehensive Plan: RES-4
Service Area: Urban
Community Plan: Greater Carrollwood Northdale
Existing Zoning: PD (05-01102)
Request: Minor Modification of PD
· Modify site plan, operating hours and buffering/screening
for automated car wash.
RECOMMENDATION: Approvable, subject to proposed conditions | Continued | Pass |
Action details
|
Not available
|
PRS 22-0738
| A.8. | Withdrawls, Continuances and Remands | PRS 22-0738 HILLSBOROUGH COUNTY CAPITAL PROGRAMS
The application has been withdrawn by the staff. | Continued | Pass |
Action details
|
Not available
|
PRS 22-0739
| A.9. | Withdrawls, Continuances and Remands | PRS 22-0739 DR. CRAIG AMSHEL
Staff is requesting the item be continued to the September 13, 2022, Board of County Commissioners
Land Use Meeting at 9:00 A. M. | Continued | Pass |
Action details
|
Not available
|
PRS 22-0833
| A.10. | Public Hearing-Land Use | Application Number: PRS 22-0833
Applicant: GALENCARE, INC
Location: 119 Oakfield Dr.
Folio Number: 71490.0555
Acreage: 18.23 acres, more or less
Comprehensive Plan: P/QP
Service Area: Urban
Community Plan: Brandon
Existing Zoning: PD (97-0121)
Request: Minor Modification to PD
· Add pedestrian access
RECOMMENDATION: Approval | Continued | Pass |
Action details
|
Not available
|
PRS 22-0844
| A.11. | Public Hearing-Land Use | Application Number: PRS 22-0844
Applicant: KAMI CORBETT, HILL WARD HENDERSON
Location: SW Corner of Muck Pond Rd & Mcintosh Rd.
Folio Number: 82881.0000,82885.0000 & 82855.0050
Acreage: 19.04 acres, more or less
Comprehensive Plan: RES-1
Service Area: Rural
Community Plan: Thonotosassa
Existing Zoning: PD (98-0823)
Request: Minor Modification to PD
· Add and remove access and modify building location
RECOMMENDATION: Approvable, subject to proposed conditions | Continued | Pass |
Action details
|
Not available
|
PRS 22-0937
| A.12. | Withdrawls, Continuances and Remands | PRS 22-0937 BDG CITRUS POINT II, LLC
The application has been withdrawn by the applicant | Continued | Pass |
Action details
|
Not available
|
PRS 22-0938
| A.13. | Public Hearing-Land Use | Application Number: PRS 22-0938
Applicant: SALEM HOLDINGS LLC
Location: 11809 E 92 Hwy.
Folio Number: 63372.0000
Acreage: 2.8 acres, more or less
Comprehensive Plan: CMU-12
Service Area: Urban
Community Plan: Seffner Mango
Existing Zoning: PD (97-0407)
Request: Minor Modification to PD
· Modify site plan to remove permitted contractor’s office
so as to develop with other permitted uses
RECOMMENDATION: Approvable, subject to proposed conditions | Continued | Pass |
Action details
|
Not available
|
PRS 22-0940
| A.14. | Withdrawls, Continuances and Remands | PRS 22-0940 BDG CITRUS POINT I, LLC
The application has been withdrawn by the applicant | Continued | Pass |
Action details
|
Not available
|
PRS 22-0941
| A.15. | Public Hearing-Land Use | Application Number: PRS 22-0941
Applicant: BLUE SKY COMMUNITIES, LLC
Location: 4450 Mango Rd./ 4450 579 Hwy.
Folio Number: 64833.0100
Acreage: 20 acres, more or less
Comprehensive Plan: RES-9
Service Area: Urban
Community Plan: Seffner Mango
Existing Zoning: PD (21-0297)
Request: Minor Modification to PD
· Increase building height and modify screening/buffering
RECOMMENDATION: Approvable, subject to proposed conditions | Continued | Pass |
Action details
|
Not available
|
MM 22-0452
| B.1. | Consent Agenda | Application Number: MM 22-0452
Applicant: WOODFIELD ACQUISITIONS LLC
Location: 60ft SW of Palm River Rd & Estuary Lakes Dr Intersection.
Folio Number: 72210.1304, 72210.1306, 72210.1308, 72210.1316, 72210.1320
72210.1322
Acreage: 8.73 acres, more or less
Comprehensive Plan: RMU-35
Service Area: Urban
Community Plan: Brandon
Existing Zoning: PD (02-0139)
Request: Major Modification to PD
RECOMMENDATION:
Zoning Hearing Master: Approval
Development Services: Approvable, subject to conditions
Planning Commission: Consistent with Plan | Approved | Pass |
Action details
|
Not available
|
RZ-STD 22-0690
| B.2. | Consent Agenda | Application Number: RZ-STD 22-0690
Applicant: CLAYTON BRICKLEMYER, BRICKLEMYER LAW GROUP P.L.
Location: 10114 Woodberry Rd.
Folio Number: 67888.0100
Acreage: 0.68 acres, more or less
Comprehensive Plan: UMU-20
Service Area: Urban
Community Plan: Brandon
Existing Zoning: RSC-6
Request: Rezone to M
RECOMMENDATION:
Zoning Hearing Master: Approval
Development Services: Approval
Planning Commission: Consistent with Plan | Approved | Pass |
Action details
|
Not available
|
2022-0084
| B.3. | Consent Agenda | Antilla Street Utilities Off-Site
Grant permission to the Development Review Division of Development Services Department to
administratively accept the Required Off-Site Improvement Facilities (water and wastewater) for
Maintenance upon proper completion, submittal and approval of all required documentation, and
construction final acceptance by the Development Review Division of Development Services
Department to serve Antilla Street Utilities Off-Site located in Section 02, Township 28, and
Range 17. Also provide the administrative rights to release the warranty security upon expiration
of the warranty period, warranty inspection and correction of any failure, deterioration or damage
to the Improvement Facilities. Accept a Warranty Check in the amount of $4,747.35 and
authorize the Chairman to execute the Agreement for Warranty of Required Off-Site
Improvements. | Approved | Pass |
Action details
|
Not available
|
2022-0085
| B.4. | Consent Agenda | Avila Unit 14 Phase 2C
Accept the plat for recording for Avila Unit 14 Phase 2C, A Private Subdivision, located in
Section 26, Township 27, and Range 18. Construction has been completed and has been certified
by Clint R Cuffie, a Florida Professional Engineer, with Water Resource Associates, LLC. | Approved | Pass |
Action details
|
Not available
|
2022-0086
| B.5. | Consent Agenda | Davis Heather Estates fka Taylor Road Subdivision
Accept the plat for recording for Davis Heather Estates flea Taylor Road Subdivision, located in
Section 34, Township 28, and Range 20, and grant permission to the Development Review
Division of Development Services Department to administratively accept the Improvement
Facilities (roads, drainage, water, wastewater along with off-site roads and wastewater) for
Maintenance upon proper completion, submittal and approval of all required documentation.
Also provide the administrative rights to release the performance securities for construction and
lot comers upon final acceptance by the Development Review Division of Development Services
Department and also provide the administrative rights to release the warranty security upon
expiration of the warranty period, warranty inspection and correction of any failure, deterioration
or damage to the Improvement Facilities. Accept a Performance Bond in the amount of
$105,247.50, a Warranty Bond in the amount of $86,172.16, and authorize the Chairman to
execute the Subdivider's Agreem | Approved | Pass |
Action details
|
Not available
|
2022-0087
| B.6. | Consent Agenda | Forest Brooke Subdivision Active Adult Phases 4, 5B, 6B, 8B and Collector
Road 2nd Extension Phase 2
Accept a new agreement for Construction and Warranty of Required Improvements for Forest
Brooke Subdivision Active Adult Phases 4, 5B, 6B, 8B and Collector Road 2nd Extension Phase
2 and new sureties for performance and warranty. Grant permission to the Development Review
Division of Development Services Department to administratively accept the Improvement
Facilities (water and wastewater) for each Phase (Phase 4A and a Remaining Phase consisting of
Phase 4B, 5B, 6B, 8B and the Collector Road 2nd Extension Phase 2) for Maintenance upon
proper completion, submittal and approval of all required documentation. Also provide the
administrative rights to release the performance securities for construction of each Phase upon
final acceptance by the Development Review Division of Development Services Department and
provide the administrative rights to release the warranty security for each Phase upon expiration
of the warranty period for such Phase, warranty inspection and corr | Approved | Pass |
Action details
|
Not available
|
2022-0088
| B.7. | Consent Agenda | Integra Palms fka Bloomingdale at Simpson Apartments Off-Site
Grant permission to the Development Review Division of Development Services Department to
administratively accept the Required Off-Site Improvement Facilities (roads, drainage, water and
wastewater) for Maintenance upon proper completion, submittal and approval of all required
documentation, and construction final acceptance by the Development Review Division of
Development Services Department to serve Integra Palms fka Bloomingdale at Simpson
Apartments Off-Site located in Section 05, Township 30, and Range 20. Also provide the
administrative rights to release the warranty security upon expiration of the warranty period,
warranty inspection and correction of any failure, deterioration or damage to the Improvement
Facilities. Accept a Warranty Bond in the amount of $120,996.72 and authorize the Chairman to
execute the Agreement for Warranty of Required Off-Site Improvements. | Approved | Pass |
Action details
|
Not available
|
2022-0089
| B.8. | Consent Agenda | Mango Terrace Apartments Off-Site
Grant permission to the Development Review Division of Development Services Department to
administratively accept the Required Off-Site Improvement Facilities (roads, drainage and
sidewalks) for Maintenance upon proper completion, submittal and approval of all required
documentation, and construction final acceptance by the Development Review Division of
Development Services Department to serve Mango Terrace Apartments Off-Site located in
Section 09, Township 29, and Range 20. Also provide the administrative rights to release the
warranty security upon expiration of the warranty period, warranty inspection and correction of
any failure, deterioration or damage to the Improvement Facilities. Accept a Warranty Bond in
the amount of $15,732.49 and authorize the Chairman to execute the Agreement for Warranty of
Required Off-Site Improvements. | Approved | Pass |
Action details
|
Not available
|
2022-0090
| B.9. | Consent Agenda | Powell Road East of US 41 Off-Site
Grant permission to the Development Review Division of Development Services Department to
administratively accept the Required Off-Site Improvement Facilities (roadway) for Maintenance
upon proper completion, submittal and approval of all required documentation, and construction
final acceptance by the Development Review Division of Development Services Department to
serve Powell Road East of US 41 Off-Site located in Section 11, Township 31, and Range 19.
Also provide the administrative rights to release the warranty security upon expiration of the
warranty period, warranty inspection and correction of any failure, deterioration or damage to the
Improvement Facilities. Accept a Warranty Bond in the amount of$26,330.10 and authorize the
Chairman to execute the Agreement for Warranty of Required Off-Site Improvements. | Approved | Pass |
Action details
|
Not available
|
2022-0091
| B.10. | Consent Agenda | Ridgewood South Subdivision fka Cole Parcel Subdivision
Accept the plat for recording for Ridgewood South Subdivision fka Cole Parcel Subdivision,
located in Section 04, Township 31, and Range 20, and grant permission to the Development
Review Division of Development Services Department to administratively accept the
Improvement Facilities (roads, drainage, water and wastewater) for Maintenance upon proper
completion, submittal and approval of all required documentation. Also provide the
administrative rights to release the performance securities for construction and lot corners upon
final acceptance by the Development Review Division of Development Services Department and
also provide the administrative rights to release the warranty security upon expiration of the
warranty period, warranty inspection and correction of any failure, deterioration or damage to the
Improvement Facilities. Accept a Performance Bond in the amount of $3,907,169.53, a
Warranty Bond in the amount of $373,397.23, and authorize the Chairman to execute the
Subdivider's Agreement for Con | Approved | Pass |
Action details
|
Not available
|
2022-0092
| B.11. | Consent Agenda | River Park Subdivision Off-Site
Grant permission to the Development Review Division of Development Services Department to
administratively accept the Required Off-Site Improvement Facilities (roadway and tumlane) for
Maintenance upon proper completion, submittal and approval of all required documentation, and
construction final acceptance by the Development Review Division of Development Services
Department to serve River Park Subdivision Off-Site located in Section 23, Township 28, and
Range 19. Also provide the administrative rights to release the warranty security upon expiration
of the warranty period, warranty inspection and correction of any failure, deterioration or damage
to the Improvement Facilities. Accept a Warranty Bond in the amount of $10,097.80 and
authorize the Chairman to execute the Agreement for Warranty of Required Off-Site
Improvements. | Approved | Pass |
Action details
|
Not available
|
2022-0093
| B.12. | Consent Agenda | Ventana Phase 5
Accept the plat for recording for Ventana Phase 5, located in Section 31, Township 30, and
Range 20, and grant permission to the Development Review Division of Development Services
Department to administratively accept the Improvement Facilities (drainage) for Maintenance
upon proper completion, submittal and approval of all required documentation. Also provide the
administrative rights to release the performance securities for construction and lot corners upon
final acceptance by the Development Review Division of Development Services Department and
also provide the administrative rights to release the warranty security upon expiration of the
warranty period, warranty inspection and correction of any failure, deterioration or damage to the
Improvement Facilities. Accept a Performance Bond in the amount of $74,448.38, a Warranty
Bond in the amount of $5,955.87, and authorize the Chairman to execute the Subdivider's
Agreement for Construction and Warranty of Required Improvements. Also accept a
Performance Bond for Placement of Lot Corners in th | Approved | Pass |
Action details
|
Not available
|
2022-0094
| B.13. | Consent Agenda | Waterset - Wolf Creek Phase D2
Accept the plat for recording for Waterset - Wolf Creek Phase D2, located in Section 26,
Township 31, and Range 19, and grant permission to the Development Review Division of
Development Services Department to administratively accept the Improvement Facilities (roads,
drainage, water, wastewater and reclaimed water) for Maintenance upon proper completion,
submittal and approval of all required documentation. Also provide the administrative rights to
release the performance securities for construction and lot corners upon final acceptance by the
Development Review Division of Development Services Department and also provide the
administrative rights to release the warranty security upon expiration of the warranty period,
warranty inspection and correction of any failure, deterioration or damage to the Improvement
Facilities. Accept a Performance Bond in the amount of $9,647,510.40, a Warranty Bond in the
amount of $745,696.83, and authorize the Chairman to execute the Subdivider's Agreement for
Construction and Warranty of Require | Approved | Pass |
Action details
|
Not available
|
V21-0014
| C.1. | Withdrawls, Continuances and Remands | Public Hearing - Vacating Petition V21-0014, by Edith Sylvia Knox, as Trustee of the Knox Living Trust
dated August 8,2008 to vacate a portion of 50-foot wide unimproved platted public right-of-way, in Plant
City for more efficient farming operations
This application has been withdrawn by the applicant | Continued | Pass |
Action details
|
Not available
|
PRS 22-0850
| E.1. | Public Hearing-Land Use | Application Number: PRS 22-0850
Applicant: TY WITCHERINGTON
Location: 19203 N Dale Mabry Hwy.
Folio Number: 13474.0250
Acreage: 0.39 acres, more or less
Comprehensive Plan: RES-1
Service Area: Rural
Community Plan: Lutz
Existing Zoning: PD (99-1397)
Request: Minor Modification to PD
· Increase entitlements for Health Practitioner’s Office
RECOMMENDATION: Approvable, subject to proposed conditions | Approved | Pass |
Action details
|
Not available
|
PRS 22-0939
| E.2. | Public Hearing-Land Use | Application Number: PRS 22-0939
Applicant: SOUTHSHORE BAY CLUB, LLC & DUNE FL LAND I SUB, LLC
Location: W Side of Lagoon Shore Blvd & Sailor Pines Ct Intersection.
Folio Number: 78878.0000 & 78878.0010
Acreage: 47.15 acres, more or less
Comprehensive Plan: RES-6 & RES-4
Service Area: Urban
Community Plan: Wimauma
Existing Zoning: PD (05-0210)
Request: Minor Modification to PD
· Modify hours of operation for General/Indoor Recreation Use
RECOMMENDATION: Approvable, subject to proposed conditions | Approved | Pass |
Action details
|
Not available
|
CDD 22-0551
| E.3. | Public Hearing-Land Use | CDD 22-0551 PETITION TO ESTABLISH THE WATERSET SOUTH COMMUNITY DEVELOPMENT
DISTRICT (CDD)
Establish the Waterset South Community Development District (CDD) in accordance with the attached
ordinance.
No direct financial impact to the County will occur as a result of this petition.
Of the total $122,547,611 budgeted for CDD-qualified common area infrastructure development costs
(“common costs”), it is estimated that about $25,175,600 (or 21%) of those costs will be funded with
long-term CDD bond proceeds. | Approved | Pass |
Action details
|
Not available
|
CDD 22-0659
| E.4. | Public Hearing-Land Use | CDD 22-0659 PETITION TO EXPAND THE BALM GROVE COMMUNITY DEVELOPMENT
DISTRICT (CDD)
Approve expansion of the Balm Grove Community Development District (CDD) in accordance with the attached
ordinance. No direct financial impact to the County will occur as a result of this petition.
Of the total of $47,610,941 budgeted for CDD-qualified common area infrastructure development costs
(“common costs”), it is estimated that $21,496,483 (or about 45%) of total development costs
will be funded with long-term CDD bond proceeds. | Approved | Pass |
Action details
|
Not available
|
CDD 22-0660
| E.5. | Public Hearing-Land Use | CDD 22-0660 PETITION TO EXPAND THE BELMOND RESERVE COMMUNITY
DEVELOPMENT DISTRICT (CDD)
Approve expansion of the Belmond Reserve Community Development District (CDD) in accordance with
the attached ordinance. No direct financial impact to the County will occur as a result of this petition.
Of the total of $15,065,098 budgeted for CDD-qualified common area infrastructure development costs
(“common costs”), it is estimated that $9,421,814 (or about 63%) of total development costs will be funded
with long-term CDD bond proceeds. | Approved | Pass |
Action details
|
Not available
|
CDD 22-0661
| E.6. | Public Hearing-Land Use | CDD 22-0661 PETITION TO EXPAND THE SHERWOOD MANOR COMMUNITY
DEVELOPMENT DISTRICT (CDD)
Approve expansion of the Sherwood Manor Community Development District (CDD) in accordance with the
attached ordinance. No direct financial impact to the County will occur as a result of this petition.
Of the total of $23,713,387 budgeted for CDD-qualified common area infrastructure development costs
(“common costs”), it is estimated that $10, 582,316 (or about 45%) of total development costs will be
funded with long-term CDD bond proceeds. | Approved | Pass |
Action details
|
Not available
|
RZ-PD 18-0798
| F.1. | Regular Agenda Item | Application Number: RZ-PD 18-0798 (Remand)
Applicant: JOHNSON POPE BOKOR RUPPEL & BURNS, LLP
Location: 108 N US Hwy 41.
Folio Number: 55805.0000
Acreage: 0.52 acres, more or less
Comprehensive Plan: OC-20
Service Area: Urban
Community Plan: Ruskin & SouthShore Areawide Systems
Existing Zoning: RTC-1 & 07-0517
Request: Rezone to PD
RECOMMENDATION:
Zoning Hearing Master: Denial
Development Services: Not Supportable
Planning Commission: Inconsistent with the Plan | Denied | Pass |
Action details
|
Not available
|
RZ-PD 20-1253
| F.2. | Regular Agenda Item | Application Number:
RZ-PD 20-1253 (Remand)
Applicant:
RKM DEVELOPMENT CORP C/O WILLIAM LLYOD
Location:
500ft N of Intersection: N Us Hwy 41 & Cristal Grove Blvd.
Folio Number:
13693.0000
Acreage:
2.91 acres, more or less
Comprehensive Plan:
RES-2
Service Area:
Rural
Community Plan:
Lutz
Existing Zoning:
ASC-1
Request:
Rezone to PD
RECOMMENDATION:
Zoning Hearing Master:
Approval
Development Services:
Approvable, subject to conditions
Planning Commission:
Consistent with Plan | Approved | Pass |
Action details
|
Not available
|
MM 21-0169
| F.3. | Regular Agenda Item | Application Number: MM 21-0169 (Remand)
Applicant: TODD PRESSMAN
Location: 5326 Williams Rd.
Folio Number: 65027.0000
Acreage: 21.82 acres, more or less
Comprehensive Plan: UMU-20
Service Area: Urban
Community Plan: Seffner Mango
Existing Zoning: PD (00-0171)
Request: Major Modification to PD
RECOMMENDATION:
Zoning Hearing Master: Denial
Development Services: Not Supportable
Planning Commission: Inconsistent with the Plan | Approved | Pass |
Action details
|
Not available
|
RZ-PD 22-0439
| F.4. | Regular Agenda Item | Application Number: RZ-PD 22-0439
Applicant: BELLEAIR DEVELOPMENT, LCC
Location: 420ft NE of Gunn Hwy & Sheldon Rd Intersection.
Folio Number: 3141.0020
Acreage: 0.59 acres, more or less
Comprehensive Plan: CPV
Service Area: Urban
Community Plan: Citrus Park Village, Sub Area G (12 du/ac, 0.25 FAR)
Existing Zoning: CPV-G-6 (04-0315)
Request: Rezone to PD
RECOMMENDATION:
Zoning Hearing Master: Approval
Development Services: Approvable, subject to conditions
Planning Commission: Consistent with Plan | Approved | Pass |
Action details
|
Not available
|
RZ-STD 22-0580
| F.5. | Regular Agenda Item | Application Number: RZ-STD 22-0580
Applicant: HARIDAS B & PRABHAVATI H BHOGADE
Location: W Side of the County Rd 579 & 240 ft S of Pruett Rd.
Folio Number: 62275.0000 & 62281.0100
Acreage: 11.51 acres, more or less
Comprehensive Plan: RES-4
Service Area: Rural
Community Plan: Thonotosassa
Existing Zoning: RSC-4, AS-1 & MH
Request: Rezone to RSC-4 & MH
RECOMMENDATION:
Zoning Hearing Master: Approval
Development Services: Approval
Planning Commission: Consistent with Plan | Continued | Pass |
Action details
|
Not available
|
RZ-STD 22-0699
| F.6. | Regular Agenda Item | Application Number:
RZ-STD 22-0699
Applicant:
BRICKLEMYER LAW GROUP P.L.
Location:
11106 Old Fort Trl.
Folio Number:
59814.0000
Acreage:
8.75 acres, more or less
Comprehensive Plan:
RES-1
Service Area:
Rural
Community Plan:
Thonotosassa
Existing Zoning:
AR
Request:
Rezone to AS 0.4
RECOMMENDATION:
Zoning Hearing Master:
Approval
Development Services:
Approval
Planning Commission:
Consistent with Plan | Continued | Pass |
Action details
|
Not available
|
RZ-STD 22-0702
| F.7. | Regular Agenda Item | Application Number: RZ-STD 22-0702
Applicant: RODRIGUES, JOSE R. & PEDRO J
Location: 6400 Hartford St.
Folio Number: 47345.0000
Acreage: 4.61 acres, more or less
Comprehensive Plan: RES-6
Service Area: Urban
Community Plan: Greater Palm River
Existing Zoning: ASC-1
Request:
RECOMMENDATION:
Zoning Hearing Master: Denial
Development Services: Not supportable
Planning Commission: Inconsistent with the Plan | Approved | Pass |
Action details
|
Not available
|
V20-0018
| G.1.A. | Public Hearings - Related Items | Vacating Petition by Lennar Homes, LLC and Crestview Lakes Community Association,
Inc. to vacate and replace a platted public pump station site, in Riverview.
(a) Adopt a resolution vacating all of Tract “Z,” a platted public pump station site within the plat of Rivercrest
Lakes, as recorded in Plat Book 134, Page 180, of the public records of Hillsborough County, and being more
particularly described in the Resolution. (b) Accept an exclusive water/waste water easement over the
reconfigured public pump station site and existing public utility lines. During construction of the Rivercrest
Lakes development, the public pump station was built outside of the designated platted pump station tract.
The petitioners, Lennar Homes, LLC and Crestview Lake Community Association, Inc., have submitted this
request to release the previous platted pump station site and rededicate the new pump station site to
Hillsborough County. The proposed vacate area is located within Folio No. 077345-8540 (no physical
address), generally lying north of Rhodine Road, east of US Highway 301, a | Approved | Pass |
Action details
|
Not available
|
2022-0095
| G.1.B. | Public Hearings - Related Items | Rivercrest Lakes Replat
Accept the re-plat for recording for Rivercrest Lakes Replat, a Subdivision, located in Section
33, Township 30, and Range 30. Construction has been completed and has been certified by
Chris OKelley, a Florida Professional Engineer, with Clearview Land Design. Lot corners are in
place and placement was certified by Clearview Land Design. | Approved | Pass |
Action details
|
Not available
|
2022-0096
| I.1. | Staff Items | Report on Possible Land Development Code and Comprehensive Plan Amendments Related to the Gopher
Tortoise Habitat Protection | Approved | |
Action details
|
Not available
|